121;This study was undertaken in three surface quarries located in Johor State (Malaysia). Their locations are shown in Fig. 2. The monthly production of these mines is
2015322;In this regard, 232 blasting operations were investigated in five granite quarries, Malaysia. Blasting parameters comprising maximum charge
20171220;Based on the analysis, the rock mass properties at this line quarry have high influence to blasting effects and the effect can be
201461;Based on influential parameters on AOp, many attempts have been done to establish correlations for AOp prediction. Kuzu et al. [9] established a new empirical
201671;The conventional blasting rock excavation method is the main means of rock breakage because of its high productivity, and it is relatively inexpensive compared to other
51;The geological conditions are constant, and the most important one is the optimization of blasting parameters. Reasonable blasting parameters is an important means to
Department of Mineral and Geoscience, Malaysia (DMG) has recommended the maximum allowable limit of PPV value for quarry blasting as 5 mm/s for human comforts and stability of
Uniblastcon Sdn Bhd was established in year 1996 (Formerly under Uniblast Contractor). We are specialist in using explosives for open and control blasting in rock excavation. We had more
2015920;This paper discusses the effect of parameters on rock blasting, such as drilling patterns, short delay intervals, the specific charge, the charged construction, the ratio of the
of quarry blasting from Quarry A and B towards the nearby residential area. This outcome may contribute to the knowledge of rock blast management by enriching the parameters selection
2017728;Blast hole drilling is a technique used in mining where holes are drilled into rock, packed with explosives, and detonated. The seminar discusses the blast hole drilling process,
1114;Figure 3: Calculated recommended minimum clearance zone for 102mm blastholes (St George & Gibsin, 2001) When determining the minimum clearance zone,
A cubic metre of material (rock) in situ before it is drilled and blasted. Bench. A flat horizontal working area in both surface mines and quarries. The bench forms a single level of operation
ing operations were investigated in five granite quarries, Malaysia. Blasting parameters comprising maximum Undesirable projection of rock fragments due to blasting
This paper aims to study the effect of geological condition on fragmentation produced by blasting in a marble quarry in Simpang Pulai, Perak, Malaysia; as the condition of the in-situ rock mass
201611;This paper aims to study the effect of geological condition on fragmentation produced by blasting in a marble quarry in Simpang Pulai, Perak, Malaysia; as the condition of
nearby blasting operations. No structural damage will occur due to noise or vibration within the MOE limits. Physical breaking or cracking of the rock is limited to a localized area around each
Quarries in Malaysia with Multi-Variable Regression Analysis *Bhatawdekar R. M., Mohamad E. T., Armaghani D. J. and pressure due to rock blasting. wave. relationship with AOp such
314;It is can be concluded that the blasting activities in this quarry although at maximum charge per delay (Wmax) was being carried out safely with very minimal effects to
safe blasting in a quarry. The parameters involved are blast surface burden, spacing, bench height, explosive The granitic rock behavior, blast design parameters used and literally short
Under the Blasting Regulation, Shotfirer Licence (Lesen Pembedil) is divided into three categories: Coal Mining Blasting Currently the issuance of Shotfirer Licence is only for Surface
2017728;Rock blasting for mining - Download as a PDF or view online for free and dynamite used in quarry blasting and compares their properties. Mine Opening and
14;S. Sharma, P. Rai, Establishment of blasting design parameters influencing mean fragment size using state-of-art statistical tools and techniques. Measurement 96, 34–51
of quarry blasting from Quarry A and B towards the nearby residential area. This outcome may contribute to the knowledge of rock blast management by enriching the parameters selection
A cubic metre of material (rock) in situ before it is drilled and blasted. Bench. A flat horizontal working area in both surface mines and quarries. The bench forms a single level of operation
1024;Blast Design Parameters. When designing a blast, several parameters are considered, including bench height, hole diameter, rock type, and explosive type. The
314;It is can be concluded that the blasting activities in this quarry although at maximum charge per delay (Wmax) was being carried out safely with very minimal effects to
Blasting is the most productive excavation method in hard rock mining. In quarries, to remove the mother rock from in-situ and crush into the desired size is realized by bench blasting method.
2025319;Blasting in mining and quarrying serves multiple purposes but poses environmental challenges, notably generating shockwaves and vibrations through peak
14;S. Sharma, P. Rai, Establishment of blasting design parameters influencing mean fragment size using state-of-art statistical tools and techniques. Measurement 96, 34–51